Adds additional validation for manual tasks and assignments without resources.
Features
- Added support for the reading and writing of extended attributes for resource assignments.
- Added additional validation for manual tasks and assignments without resources.
Fixes
- Fixed calculation of Stop/Resume dates when assignment percent work equals 100.
- Fixed calculation of Start/Finish dates when duration is set after them.
- Fixed calculation of Stop/Resume dates of tasks during recalculation.
- Writes contoured time phased data in the wrong way.
- A HyperlinkBase project property value is truncated up to 15 characters.
- Duration is zeroed when material resource is being used.
- No links on tasks after an export to PDF/HTML/images.
- Resource usage distribution is not correct in the resultant MPP file.
- Wrong elapsed duration for a summary task.
- Actual Start date disappears after a resaving.
- Partial baselines are skipped when reading assignments baselines.
- XER to MPP raises TaskWritingException.
- Baseline extended attribute values for assignments are lost in resaved file.
- Wrong duration set for all tasks when days set for a task.
- Wrong dates/duration set in MPP for CalculationMode.None and IsManual = true.
- Extra extended attribute value fetched for a task.
- Schedule is broken after a resave of XML MSP project with custom time phased data.
- Extended attributes lost while resaving MPP file.